| LEED-NC CREDITS (Based on LEED-NC Version 3) |
Possible Points |
Materials & Resources
|
|
Construction Waste Management (credit 2): Recycle and/or salvage at least 50% or 75% of nonhazardous construction and demolition debris
|
1-2
|
|
Recycled Content (credit 4): Use materials with recycled content such that the sum of post-consumer recycled content plus one-half of the pre-consumer content constitutes at least 10% or 20% (based on cost) of the total value of the materials in the project.
|
1-2
|
|
Regional Materials (credit 5): Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 miles of the project site for a minimum of 10% or 20% (based on cost) of the total materials value.
|
1-2
|